🏥 Healthcare Case Study

NHS Foundation Trust WiFi Survey

Comprehensive 60-day wireless network assessment across major NHS hospital. Professional analysis of 800 access points covering every clinical and non-clinical area.

🏥 Major NHS Trust 📡 800 Access Points ⏱️ 60-Day Project 👥 2-Person Team 🌙 Night Shift Access

The Challenge

A major NHS Foundation Trust needed comprehensive wireless network assessment to optimize patient care connectivity

Critical Connectivity Issues
  • Patient Care Disruption: WiFi dead zones affecting medical devices and patient monitoring
  • Clinical Workflow Impact: Staff unable to access patient records in certain areas
  • Emergency Response: Communication blackspots in critical care areas
  • Infection Control: Limited access to isolation wards and infectious disease units
Complex Healthcare Environment
  • Operational Constraints: Hospital operating 24/7 with minimal disruption allowed
  • Security Requirements: High-security areas requiring special access protocols
  • Patient Privacy: Sensitive areas requiring careful survey methodology
  • Infrastructure Age: Legacy network with mixed equipment generations

Project Scope & Requirements

Access Points:
800 APs across site
Coverage Areas:
100% hospital footprint
Timeline:
60 days maximum
Disruption:
Minimal patient impact

Our Professional Methodology

Systematic approach ensuring comprehensive coverage while maintaining patient care standards

🗓️
Pre-Survey Planning
  • Liaison with NHS IT and facilities teams
  • Security clearance and access protocols
  • Infection control training and certification
  • Detailed floor plans and AP location mapping
🌙
Night Shift Operations
  • After-hours access to critical areas
  • Operating theatre surveys during maintenance windows
  • ICU assessments with minimal patient disruption
  • Emergency department coordination
📋
Comprehensive Documentation
  • Individual area reports and recommendations
  • Heat maps showing coverage gaps
  • Specific AP relocation proposals
  • Power level optimization suggestions

Complete Hospital Coverage

Every single area of the hospital was professionally surveyed and analyzed

Clinical Areas
All Patient Wards
Operating Theatres
Intensive Care Units
Emergency Department
Maternity Units
Pediatric Wards
Isolation Units
Infectious Disease Wards
Support Areas
Administrative Offices
Consulting Rooms
Corridors & Lobbies
Patient Toilets
Staff Areas
Cafeterias
Storage Areas
Basement Levels
Human-Centered Approach
Patient Interaction:

Respectful communication with patients during bedside surveys, explaining our work and minimizing disruption

Clinical Staff Coordination:

Close collaboration with nurses, doctors, and technicians to schedule surveys around patient care

Infection Control Compliance:

Full PPE protocols, hand hygiene stations, and isolation area procedures followed meticulously

Critical Findings

Comprehensive analysis revealed significant network optimization opportunities

47

Critical Dead Zones Identified

435

Access Points Requiring Relocation

75

New Access Points Required

Coverage Gap Analysis
  • Patient Care Impact: 23 wards with inadequate bedside coverage
  • Medical Device Connectivity: 12 areas affecting vital sign monitors
  • Staff Communication: 8 nurse stations with poor signal strength
  • Emergency Access: 4 critical care areas with dead zones
Optimization Recommendations
  • AP Relocations: 435 existing access points requiring repositioning for optimal coverage
  • New Installations: 75 additional access points required to eliminate dead zones
  • Mounting Changes: Wall-mounted APs recommended for ceiling installation in high-traffic areas
  • Power & Channel Optimization: Detailed adjustments for interference reduction

Comprehensive Deliverables

Detailed documentation enabling informed decision-making and implementation

Bespoke Area Reports
  • 📋 Individual Ward Analysis: Specific recommendations for each clinical area
  • 📊 Signal Strength Mapping: Heat maps showing coverage quality
  • 📍 AP Positioning: Precise relocation coordinates and mounting specifications
  • ⚙️ Power Level Settings: Optimized dBm recommendations per access point
Executive Summary
  • 🎯 Priority Actions: Critical fixes ranked by patient care impact
  • 💰 Cost Analysis: Budget planning for recommended improvements
  • 📅 Implementation Timeline: Phased approach minimizing service disruption
  • 📈 Expected Outcomes: Predicted network performance improvements

Project Success

Comprehensive survey delivered actionable insights enabling significant network improvements

100%

Hospital Coverage Analyzed

📡

435

APs to be Relocated

75

New APs Required

60

Days to Completion

Critical Healthcare Impact ⚕️

  • Patient Care Enhancement: Eliminated connectivity gaps affecting medical devices
  • Clinical Workflow Optimization: Improved staff access to patient records
  • Emergency Response: Enhanced communication in critical care areas
  • Infection Control Compliance: Maintained highest safety standards throughout
  • Actionable Intelligence: Detailed roadmap for network improvements
  • Professional Standards: NHS IT team equipped with comprehensive analysis

Professional Healthcare WiFi Services

Specialist wireless surveys and optimization for NHS trusts, private hospitals, and healthcare facilities across Norfolk

🏥 Expert Healthcare Network Assessment

✅ NHS Foundation Trust experience
✅ Clinical environment expertise
✅ Infection control compliance
✅ 24/7 operational awareness
✅ Patient-centered approach

CRB Checked • Infection Control Trained • Professional Indemnity Insured